Wairoa Cycleway Truss Footbridge completed… and what a great colour!!

On 17th June 2020 we performed the final inspection of the Wairoa Cycleway truss footbridge. The final solution is a breathtaking show-case of good steelwork craftsmanship and the final colour looks amazing. We selected “Resene Guru” for the truss footbridge based on our earlier 3D modelling visualisations. I was very pleased to see it was a great choice. Modelling colours on a computer is never an exact science, so it is pleasing to see the colour works really well in the real-world… WOW!

A very pleasing job. Just a few touch-ups remaining and some approach paths to complete until it gets opened. I look forward to riding along this new piece of infrastructure when it officially opens to the public in late 2020.

For more info see here: https://www.dcstructuresstudio.com/wairoa-clip-on-cycleway-truss/

Check out our projects....

Manganui Gorge Suspension Bridge - Final Visualisation
Projects

Manganui Gorge Suspension Bridge

The Manganui Gorge Bridge is a 100m long suspension bridge close to the summit of Mt. Taranaki located in New Plymouth, New Zealand. It has an impressive 93m clear span and is 1.2m wide and sits in close proximity to the existing ski-field. The purpose of the suspension bridge is to connect the “Around the Mountain” scenic walk and bypass

Read More »
Toki Poutangata Steel Railway Truss Bridge - View accross railway
Projects

Toki Poutangata Pedestrian Bridge

The name chosen for the bridge “Toki Poutangata” (or Toki for short), describes a ceremonial adze of chiefly authority, and consists of a pounamu blade lashed to an elaborately carved handle. This styling has been carried through into the truss design of the bridge structure, with its distinctive tapered shape and green colour, drawing focus to the Buller River.

Read More »
Longford cable stayed bridge
Projects

Longford Cable Stayed Bridge

Longford Cable Stayed Bridge in Gore, New Zealand is a 90m spanning cable stayed pedestrian bridge. It is a 3m wide cable stayed bridge with a 32m high steel mast. The cable stayed bridge crosses the Mataura River and connects east Gore to the main centre. Cable stayed bridge design approach The crisp white circular hollow section (CHS) steel mast

Read More »
Projects

Pukeiti Rainforest Look-out Tower

The Rainforest structures featuring a “canopy walk” and “look-out tower” were designed for Edifice Contracts Ltd as part of a Design and Construct tender for Taranaki Regional Council. The structures will form part of a unique visitor experience for the existing Pukeiti Gardens. The “Canopy Walk” will be Pukeiti Gardens signature structure and includes a 170m span suspension bridge with

Read More »