BRIDGE NZ AWARDS 2022 WINNER!!!
We were super thrilled and honored on Tuesday night (2nd August 2022) for the Water of Leith Cable-stayed Footbridge designed by DC Structures Studio to be recognized as the WINNER…
Read MoreWe were super thrilled and honored on Tuesday night (2nd August 2022) for the Water of Leith Cable-stayed Footbridge designed by DC Structures Studio to be recognized as the WINNER…
Read MoreLongford Cable Stayed Bridge in Gore, New Zealand is a 90m spanning cable stayed pedestrian bridge. It is a 3m wide cable stayed bridge with a 32m high steel mast.…
Read MoreThis work was for a concept design of a pedestrian bridge crossing over the Whakatane River. The pedestrian bridge was proposed for connecting to the southern bank immediately adjacent to…
Read More