Milford Marina Bascule Footbridge

The Milford Marina Footbridge (also called the Milford Marina Bascule Footbridge) is a 40m long architectural bascule lifting bridge in Auckland. Two hydraulic rams lift a 10m bascule span to allow boats to pass underneath when required. The bridge was initially conceived by North Shore City Council (now Auckland City Council) based on a commitment made to local residents for replacing a high level timber bridge that was removed in the nineties as it fell into disrepair. Following completion of the bridge and connecting cycleway it is now possible to walk, jog and cycle the Auckland waterfront from Mairangi Bay to Devonport without having to venture too far inland. In turn this project is enabling more access to parklands and waterfront helping people to maintain healthier and thus more productive lifestyles.

Dan was the lead bridge engineer and bridge architect for the Milford Marina Bridge whilst working at Beca. Beca are one of NZ’s largest engineering firms and we actively retain very strong relationships with their multi-award winning bridge team.

[quote author=”” source=””]A key to the success of this bridge is the adoption of simple but effective “architectural engineering” principles to incorporate bridge architecture and bridge engineering to deliver a functional but strong aesthetic.[/quote]

By Architectural Engineering principles we mean the careful consideration and selection of suitable structural form and materials that aim for a ‘perfect’ balance between engineering function, durability and architectural form. The purpose of this pursuit is to result in a refined and sometimes striking aesthetic. 

 

The main bridge lifting span is formed from steel rectangular hollow sections (RHS) combined into a simple deck form of two primary beams, three cross beams, and two members positioned diagonally as bracing. The rams are positioned to push directly in plane
with the primary members to eliminate unwanted eccentricities (which can cause structural issues). Over the steelwork a timber support system (joists) and hardwood vitex timber decking has been erected. The benefit of this arrangement is to reduce the overall weight but at the same time this enables a simple and pleasing aesthetic. The combination of the white steelwork with the timber deck create a simple and well placed nautical aesthetic. To further enhance the aesthetics of the bridge – with only a nominal cost premium – the timber decking has been arranged in a herron-bone pattern to suggest the scale and shape of a sail boat passing the channel when the bridge span is in the up position. The quality of this finish achieved by the carpenters has been outstanding in this finish.

Key Bridge Stats:

  • Total bridge length =40m
  • Lifting span length = 9.5m
  • 3No concrete approach spans circa 10m each
  • Bascule lifting span is powered by 2No. 600kN (60 tonne) hydraulic jacks
  • Lifting span = steel + timber decking. Timber decking is arranged in a heron-bone pattern to suggest the sail of a boat when the bridge is erect
  • Usable width = 3.0m shared cycleway
  • All steelwork is zinc sprayed and painted with a polyurethane white top coat to fit with the maritime surroundings.
  • Bridge operates on demand via a UHF radio. Marinas contact the remote operator to lift the bridge.
  • Officially opened December 2015
  • Client: Auckland Parks (part of Auckland City Council)

 

Check out our projects....

Manganui Gorge Suspension Bridge - Final Visualisation
Projects

Manganui Gorge Suspension Bridge

The Manganui Gorge Bridge is a 100m long suspension bridge close to the summit of Mt. Taranaki located in New Plymouth, New Zealand. It has an impressive 93m clear span and is 1.2m wide and sits in close proximity to the existing ski-field. The purpose of the suspension bridge is to connect the “Around the Mountain” scenic walk and bypass

Read More »
Toki Poutangata Steel Railway Truss Bridge - View accross railway
Projects

Toki Poutangata Pedestrian Bridge

The name chosen for the bridge “Toki Poutangata” (or Toki for short), describes a ceremonial adze of chiefly authority, and consists of a pounamu blade lashed to an elaborately carved handle. This styling has been carried through into the truss design of the bridge structure, with its distinctive tapered shape and green colour, drawing focus to the Buller River.

Read More »
Longford cable stayed bridge
Projects

Longford Cable Stayed Bridge

Longford Cable Stayed Bridge in Gore, New Zealand is a 90m spanning cable stayed pedestrian bridge. It is a 3m wide cable stayed bridge with a 32m high steel mast. The cable stayed bridge crosses the Mataura River and connects east Gore to the main centre. Cable stayed bridge design approach The crisp white circular hollow section (CHS) steel mast

Read More »
Projects

Pukeiti Rainforest Look-out Tower

The Rainforest structures featuring a “canopy walk” and “look-out tower” were designed for Edifice Contracts Ltd as part of a Design and Construct tender for Taranaki Regional Council. The structures will form part of a unique visitor experience for the existing Pukeiti Gardens. The “Canopy Walk” will be Pukeiti Gardens signature structure and includes a 170m span suspension bridge with

Read More »