DC Structures Studio - Carbon Offset Cert 2016 to 2017

DCSS Environmental Policy Launched!

We've just released our Environmental Policy: Sustainable Bridges. At DC Structures Studio we recognise that as designers of large infrastructure our working practices and the designs we develop have potentially…

Read More
Water of Leith Bridge Piling

Water of Leith Footbridge – driven piles installed!

Water of Leith Bridge Update: The works currently occurring on site are the installation of seven 18m long steel driven piles that will support the eastern end of the bridge…

Read More

Water of Leith Cable Stayed Bridge

Water of Leith Cable Stayed Bridge The Water of Leith Cable Stay Bridge is a 45m span x 3.5m cycle bridge designed by DC Structures Studio for Dunedin City Council.…

Read More